How to Estimate a Siding Job

Siding bids go wrong on squares, trim and tear-off. This checklist keeps all three in the number.

Quick answer: Estimate in order: wall squares (− openings, + waste) → trim/soffit/fascia → tear-off & wrap → labor → margin.

Squares and waste first

Convert wall area to squares, subtract large openings, and add 10–15% waste for gables, corners and cuts. This is the biggest source of siding error — the siding calculator keeps the units and waste right.

The costs that sink siding bids

Trim, soffit, fascia, corner posts and J-channel; house wrap and flashing; and tear-off and disposal of the old siding. Price each as a line item, plus the labor hours the material really needs.

Open the siding calculator →

FAQ

What do contractors forget when bidding siding?

Trim, soffit, fascia, corner posts, J-channel, house wrap, and tear-off/disposal — plus underestimating waste on gables and openings.

How do I price siding labor?

Apply a crew rate to the squares, adjusted for the material (fiber cement is slower than vinyl) and the number of openings and stories.